# Roll out a feature

## When to use

Deployed behavior needs to reach more users.

## Before you start

- A [rollout plan](https://handbook.askre.page/reference/templates.md#rollout-plan) with stages, criteria, and owners.
- Exposure authority for the next stage.
- Monitoring that can see the release and the cohort.

## Steps

1. Identify the release, the flag or targeting rule, the current cohort, and the target cohort. Check the live state.
2. Exercise the enabled path, the disabled path, and the mitigation.
3. Record the current targeting. Apply the first stage.
4. Compare the expected and observed cohort sizes. Check that the right users are included and the right users are excluded.
5. Observe user outcomes and guardrail signals against the baseline, by segment.
6. Decide with the [rollout table](https://handbook.askre.page/shipping.md#rollouts): expand, stop and mitigate, hold as inconclusive, or replan.
7. Repeat steps 3 to 6 for each stage.
8. At the end, record the final cohort, the limits, the communication, and the date to remove the flag. Stop any monitor created only for the rollout, and hand ongoing monitoring to its named owner.

## Done when

The intended audience has the behavior, the criteria are met with evidence, and monitoring, messages, and flag cleanup have owners.

## Stop and ask when

- A guardrail is breached, or users report a confirmed defect. Pause expansion, which needs no permission, and mitigate under the recovery grant.
- Telemetry is missing, the monitor fails, traffic is too low, or the version is unclear. Hold.
- An incident threshold is crossed. Switch to [Respond to an incident](https://handbook.askre.page/playbooks/respond-to-an-incident.md).
